Our Business / Wind Power Generation Project
Wind Power Generation Project
We have participated in the construction of 1000MW wind power base. We’re building 300MW wind power project as EPCM.
- Micro-siting selection for wind farms —— ensure 2400h utilization time
- Extra-long turbine blade transportation——blade length 55m
- Construction of foundation platform with high accuracy—— within ± 2mm
- Lifting of high towers and extra-long blades——tower height 95m
- High quality construction management of low/mid/high pressure substations and wiring——ensure stable operation of wind farms and the grid
- 500 top-notch wind turbine generator units with total installed capacity of 1000 MW
- Established 1x 330 kV substation, 1x 220 kV substation and 4x 110 kV substations with total capacity of 1500 MW
- Established power lines (330kV、220kV、110kV、35kV) with overall distance of 800KM